Great time building with Dad

Dad came up from Tennessee to work on the plane last weekend. We did a decent amount of work even though it didn’t look like it.

  • inspected the recently arrived wing kit and associated gear
  • We trimmed and cleaned up the shorter elevator rib in front of the trim tab.
  • Test fit trim actuator
  • cut access for the trim actuator to connect the elevator to the trim tab.
  • Riveted the bottom of the elevator together leaving the center uncompleted per directions.
  • Test fit the elevator to the horizontal stabilizer. Elevator operated smoothly.
  • Layed out hinge and drilled holes in the elevator to attach the elevator to the horizontal stabilizer.
  • Pops deburred the newly drilled holes and is ready for the next step

Thanks for the help pops!

 

Here are some pictures

Pops showing off his his riveting skills on the bottom of the elevator

Pops showing off his his riveting skills on the bottom of the elevator

 

Pops demonstrating the how the elevator works.

Pops demonstrating the how the elevator works.

Pops deburring a rib for the elevator.

Pops deburring a rib for the elevator.

 

Test fit

Test fit

Wings have been Delivered

9/17/2014  Delivery of the wing kit

9/17/2014
Delivery of the wing kit

On 9/17/2014 we received our wing kit for the plane. Cheryl and I inventoried the entire box, with only one minor part missing. A quick call to Zenith had the part in the mail and we received the part a few days later. I am excited to get started on the wings.